Gold mine

ABANDONED

Moved to ECS Town vector

The Gold mine is the part of the ECS Basic Vector.

Accepted and produced cargoes

The Gold mine produces Gold.

The Gold mine accepts Vehicles if defined.

The Gold mine does not accept any cargo during first 93 days of life if built in game.

Cargo acceptance is limited by storage capacity. If the stockpile is in overflow, the industry stops accepting cargo until the stockpile is down to 50% of capacity, at which point the industry will start accepting cargo again.

Level Machinery Machinery (50%)
Very low 171 85
Low 245 122
Normal 350 175
High 501 250
Very high 716 358
Ultimate 1023 511

Acceptance limit can be disabled with parameter of ECS Basic Vector

Construction

The Gold mine can not be built by a player in a game. It should be prospected instead. It has 68% probability to be prospected near other Gold mine (at most 64 tiles away) and 45% probability far from it. Prospecting cost is £747,700 468,750/$1,495,400 in game, in case of inflation is off. Construction conditions for SE and map generator are represented in the table.

SE Condition
+
Build on dry land
+
Build on flat land
Build > 1 tiles away from desert tile
Build at least 10 tiles away from Tz0
Build > 32 tiles from a Bank
Build > 48 tiles from a Gold mine

Description of Location/Positioning Conditions

The Gold mine has Very low probability (2) to be built by map generator and very low probability (1) to be built during game play.

Production

The Gold mine uses 124 production levels, represented in % from 3% to 100%.

To calculate a month production values should be summarized for all the cycles of the month (usually 8 or 9). The following calculations are given for one production cycle.

The Gold mine does not produce any cargo during first 93 days of life if built in game.

When vehicles are not defined, Gold mine uses formula (2) to calculate production). When vehicles are defined, Gold mine uses formula (1) if there vehicles are waiting, and (3) if not.

50 * level% / 100%
(1)
33 * level% / 100%
(2)
25 * level% / 100%
(3)

At the highest production level, 0,25 unit of vehicles (machinery) is processed per cycle. With every level below this, the amount of processed machinery units is halved (down to the lowest production level of 1 machinery unit during 16 months).

Production change

Production change happens on the 1-st day of every month.

The Gold mine does not change production level during first 93 days of life if built in game.

On the lowest production level (Very low or 3%) advanced closure mechanism is applied with the following protection conditions:

  • last one on the map
  • younger than 10 years
  • transportation level > 75%

Protection can be changed with parameter of ECS Basic Vector to the following protection conditions:

  • last one on the map
  • younger than 10 years
  • transportation level > 1%
  • Gold mine is built by the player during game play

Gold mine can have closure protections unless exhausted with parameter of ECS Basic Vector

Production change happens according on amount of cargo transported.

Transportation Production change
< 25%
divide production level by 2 if current level above 6%
-"-
decrease production level by 1 if current level 3% – 6%
25% – 49%
decrease production level by 1
51% – 75%
increase production level by 1
>75%
increase production level by 1 with 75% probability
-"-
multiply production level by 2

When all of the known gold body has been extracted, the Gold mine closes immediately.

Features

Gold body and reserves

Every Gold mine has a fixed gold body randomly predetermined during the construction phase at between 100Kt and 1100Kt. The size of the gold body is unknown to the player. At the beginning, the mine sees a reserve of 10 to 30% of the gold body. When the amount of gold transported is above 60% a month, new reserves of gold may be found, increasing the known reserves by +10% to +30%, but reserves may never exceed the predetermined gold body. Gold mine has 50% probability to find new resources when all known resources are exhausted if amount of resources known is smaller than defined in predetermined body.

When the mine plans to exhaust all the reserves within 24 or 12 months, it generates a warning.

Body limit can be disabled with parameter of ECS Basic Vector