TrackTypeCostDifferences: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
m Bot: Automated text replacement (--= +==) |
Reformat and update |
||
| Line 1: | Line 1: | ||
| ⚫ | |||
=Track Type Cost Differences= |
|||
| ⚫ | |||
==Switch== |
==Switch== |
||
| Line 18: | Line 14: | ||
This patch was contributed by Oskar Eisemuth. |
This patch was contributed by Oskar Eisemuth. |
||
[[Category:Patches]][[Category:Infrastructure Patches]][[Category:TTDPatch]][[Category:TTDPatch Manual]] |
|||
Latest revision as of 16:12, 15 June 2011
Make different types of track cost differently.
Switch
Configuration file: tracktypecostdiff
Command line: -Yc
Description
Normally, all types of track cost the same in TTD. This does not take into account that more sophisticated track is realistically expected to be more expensive.
With this switch, different types will have different costs. Regular railroad will have the same price as before, but more sophisticated track types will be increasingly more expensive.
This patch was contributed by Oskar Eisemuth.