ECS Construction Vector: Difference between revisions

From TTWiki
Jump to navigation Jump to search
Content deleted Content added
m 8 revisions
Kraks (talk | contribs)
fixed links, added images
 
(5 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[Category:ECS Vectors Abandoned Part]]

{| style="width: 100%;" border="1"
'''''ECS Construction Vector'''''
|- valign="top"

| style="width: 33%;" | << [[ECS Vectors Translations]] || align="center" style="width: 34%;"| [[ECS Vectors Abandoned Part]] || align="right" style="width: 33%;"| [[ECS Basic Vector for Arctic]] >>
=ECS Construction Vector=
|}

'''<span style='color:#FF0000'>ABANDONED</span>'''
'''<span style='color:#FF0000'>ABANDONED</span>'''


Last version - beta 5
Last version - beta 5


Would be merged into [[ECSBasicVector|Basic vector II]]
Would be merged into [[ECSBasicVector| Basic vector II]]


__TOC__
==General characteristics==
==General characteristics==


Line 16: Line 17:
==Parameters==
==Parameters==


{|
||Number|Meaning
!Number!!Meaning


|-
<center>0</center>|General behaviour change [[(ECSVectorsGeneralInformation|Description]])||
|<center>0</center>||General behaviour change ([[ECS_Vectors_General_Information#General_behaviour_change_parameter|Description]])
|}


==New industries==
==New industries==
Line 28: Line 32:


==Cargoes==
==Cargoes==
===Cargoes list===

Default cargos
Default cargos
* -
* -
Line 37: Line 41:
* Limestone (ID 1E)
* Limestone (ID 1E)


===Cargoes payment===
Payment for delivering 10 units (or 10 000 litres) of cargo a distance of 20 squares
Payment for delivering 10 units (or 10 000 litres) of cargo a distance of 20 squares


==Cargo chains==
==Cargo chains==

[[File:Ecs_constructionvector_b5.png]]

Latest revision as of 18:01, 8 July 2011

<< ECS Vectors Translations ECS Vectors Abandoned Part ECS Basic Vector for Arctic >>

ABANDONED

Last version - beta 5

Would be merged into Basic vector II

General characteristics

The GRFID is 4D656F96.

Parameters

Number Meaning
0
General behaviour change (Description)

New industries

  • Lime quarry
  • Brick works
  • Cement works
  • Construction industry
  • Large construction industry

Cargoes

Cargoes list

Default cargos

  • -

New cargoes

  • Bricks (ID 1A)
  • Cement (ID 1C)
  • Limestone (ID 1E)

Cargoes payment

Payment for delivering 10 units (or 10 000 litres) of cargo a distance of 20 squares

Cargo chains