ECS Machinery Vector. Steel Mill
<< ECS Machinery Vector. Iron ore mine | ECS Machinery Vector | ECS Machinery Vector. Vehicles Factory >> |
Valid for ECS 1.1.1
General data
Drawn by Oz. Smoke by Zimmlock and George
The Steel mill is the part of the ECS Machinery Vector.
Cargoes
Accepting
The Steel mill accepts Iron Ore and Coal.
The Steel mill does not accept any cargo during first 93 days of life if built in game.
Cargo acceptance is limited by storage capacity. If the stockpile is in overflow, the industry stops accepting cargo until the stockpile is down to 75% of capacity, at which point the industry will start accepting cargo again.
Level | Ore | Ore (75%) | Coal | Coal (75%) |
---|---|---|---|---|
Very low | 6030 | 4523 | 7475 | 5606 |
Low | 7538 | 5654 | 9344 | 7008 |
Normal | 9423 | 7067 | 11680 | 8760 |
High | 11778 | 8834 | 14600 | 10950 |
Very high | 14723 | 11042 | 18250 | 13688 |
Ultimate | 18403 | 13803 | 22813 | 17109 |
Acceptance limit can be disabled with parameter of ECS Machinery Vector
Production
The Steel mill produces Steel.
The Steel mill does not produce any cargo during first 93 days of life if built in game.
The Steel mill uses 7 production levels, meaning number of furnaces being on (from 0 to 6).
Both cargoes are a must. On the lowest production level the missing cargo would be taken from internal resources, but only when the other cargo is transported to the industry. Steel mill production is calculated from 6 furnaces. Initial values for furnaces are shown in the table (production data is calculated for 8 cycles a month. During game play, there are 8 or 9 cycles, while the total amount of distributed cargo is adjusted with property for minimal amount of cargo distributed).
Amount of material used is calculated as coal = 1.4 * steel, iron ore = 1.2 * steel.
Every furnace can be upgraded to the best one for the current date. The smallest furnace is upgraded first.
Num\Year | 1920 | 1950 | 1975 | 2000 | 2020 | 2040 |
---|---|---|---|---|---|---|
1 | 5 | 7 | 8 | 11 | 14 | 19 |
2 | 7 | 9 | 12 | 15 | 20 | 26 |
3 | 10 | 13 | 17 | 22 | 28 | 36 |
4 | 14 | 18 | 23 | 30 | 39 | 51 |
5 | 19 | 25 | 32 | 42 | 55 | 71 |
6 | 27 | 35 | 45 | 59 | 77 | 100 |
Production of steel:
Level | Furnaces on | 1920 | 1950 | 1975 | 2000 | 2020 | 2040 |
---|---|---|---|---|---|---|---|
Very low | 1 | 40 | 52 | 68 | 88 | 114 | 149 |
Low | 2 | 96 | 125 | 162 | 211 | 274 | 356 |
Normal | 3 | 174 | 227 | 295 | 383 | 498 | 648 |
High | 4 | 284 | 369 | 480 | 624 | 812 | 1055 |
Very high | 5 | 438 | 569 | 740 | 962 | 1250 | 1626 |
Ultimate | 6 | 653 | 849 | 1103 | 1435 | 1865 | 2424 |
Limit | 6* | 1291 | 1678 | 2181 | 2836 | 3687 | 4793 |
- Limit means ultimate production level (6 furnaces are on) where all furnaces are upgraded.
Production change
Production change happens on the 1-st day of every month.
The Steel mill does not change production level during first 93 days of life if built in game.
On the lowest production level advanced closure mechanism is applied with the following protection conditions:
- last one on the map
- younger than 5 years for industries, built in SE (scenario editor) or during map generation, younger than 2 years for others
- transportation level > 75%
Protection can be changed with parameter of ECS Machinery Vector to the following protection conditions:
- last one on the map
- younger than 5 years for industries, built in SE (scenario editor) or during map generation, younger than 2 years for others
- transportation level > 1%
- The Steel mill is built by the player during game play
Changing production level is calculated by comparing the amount of cargo waiting and amount of material, required for production. If there is not enough cargo waiting, production changes. Industry can rise production by 1 and decrease to any value.
Increasing production on high production levels also requires at least 50% of steel being transported.
Conditions for number of furnace going up
(Current production * 6 / 5 * 8 * 3 < Amount of ore stored) and (Current production * 7 / 5 * 8 * 3 < Amount of coal stored)
Conditions for number of furnace going down
(Current production * 6 / 5 * 8 > Amount of ore stored) or (Current production * 7 / 5 * 8 > Amount of coal stored)
Where Current production specifies amount of steel produced every 256 ticks.
Construction
The Steel mill has one of 10 possible layouts. New layouts are welcome (:biggrin:)
The Steel mill has high probability (5) to be built by map generator and low probability (1) to be built during game play.
When built by the player during a game, The Steel mill will be in Company Colours of the builder. When generated by the game or built while in the scenario editor, The Steel mill will pick up the colour randomly.
The Steel mill can be built by a player both in a game and in the scenario editor. Construction cost factor is 160. Construction conditions are represented in the table.
SE | Condition |
---|---|
Build on dry land | |
Build on flat land | |
Build at least 16 tiles away from Tz0 | |
Build > 16 tiles from a Coal mine | |
Build > 16 tiles from a Iron ore mine | |
Build > 16 tiles from a Factory | |
Build > 16 tiles from a Steel mill |
Description of Location/Positioning Conditions
Features
The Steel mill is covered with snow when located above snow line.
The Steel mill have 3 animated construction stages